80 MLD WTP

Satlasana, Gujarat

80 MLD WTP Satlasana, Gujarat The 80 MLD Water Treatment Plant (WTP) at Satlasana, developed for the Gujarat Water Supply and Sewerage Board, is a pivotal infrastructure project aimed at improving water supply and management in the region. Located at the Vav Headworks, this facility is designed to efficiently treat and distribute large volumes of…

Portfolios | Infrastructural | 80 MLD WTP
80-MLD-WTP-Main

80 MLD WTP

Satlasana, Gujarat

The 80 MLD Water Treatment Plant (WTP) at Satlasana, developed for the Gujarat Water Supply and Sewerage Board, is a pivotal infrastructure project aimed at improving water supply and management in the region. Located at the Vav Headworks, this facility is designed to efficiently treat and distribute large volumes of water to meet the needs of local communities.

Key features of the WTP include a cascade aerator, which enhances oxygen transfer and improves the overall quality of treated water. The plant is equipped with three clarifiers, each with a diameter of 37.0 meters, designed to facilitate effective sedimentation and separation of solids from water, ensuring high-quality effluent. To further enhance the treatment process, the WTP includes ten twin-type filter beds, each sized 6-9 meters by 9 meters. These filter beds play a crucial role in removing remaining impurities from the water, providing an additional layer of purification before distribution. A significant component of this facility is the 50-lakh liter sump, which serves as a storage reservoir for raw water prior to treatment. This sump is essential for managing fluctuations in water supply and ensuring a continuous flow to the treatment processes. The main pump house, measuring 30 meters by 12 meters, is strategically designed to support efficient pumping operations, facilitating the movement of treated water to various distribution points.

Our team has provided hydraulic and structural design services for this project, focusing on innovative design solutions that ensure operational efficiency and sustainability. The strategic layout and advanced engineering techniques employed in the construction of the WTP reflect our commitment to delivering high-quality infrastructure that meets community needs. The establishment of this 80 MLD WTP not only addresses immediate water supply challenges but also contributes to long-term sustainability in water resource management in Mehsana. By integrating modern technologies and efficient processes, we are proud to support Gujarat’s vision for enhanced public health and environmental stewardship.

Year: 2021

80-MLD-WTP-2
80-MLD-WTP-3
80-MLD-WTP-4